Data-driven optimization of health supply chains in the acute elderly care

Data-driven optimization of health supply chains in the acute elderly care

26 June 2025 - 31 August 2028
Resilience that Lasts: Bridging Sustainability through Adaptation and Transformation

Resilience that Lasts: Bridging Sustainability through Adaptation and Transformation

25 June 2025 - 31 August 2028
SYNERCIZE: SYnchromodal Transport NEtworks for a Construction Industry towards Zero Emissions

SYNERCIZE: SYnchromodal Transport NEtworks for a Construction Industry towards Zero Emissions

1 January 2025 - 31 December 2027
BISON-KIT: Bouwlogistiek In Stedelijke ONtwikkeling – Kansen met dIgital Twins

BISON-KIT: Bouwlogistiek In Stedelijke ONtwikkeling – Kansen met dIgital Twins

1 October 2024 - 31 March 2027
EaSiCon: Efficiency and Sustainability in Construction

EaSiCon: Efficiency and Sustainability in Construction

1 September 2024 - 1 September 2027
DigiTWOP (Multi-level Digital Twin based Warehouse Optimisation)

DigiTWOP (Multi-level Digital Twin based Warehouse Optimisation)

8 July 2024 - 31 December 2027
EnerLogiX (Integrated Energy and Logistics Planning for Electric Trucking)

EnerLogiX (Integrated Energy and Logistics Planning for Electric Trucking)

8 July 2024 - 1 December 2028
HOPE (Human-Centered Optimization for 	Supply Chain Excellence)

HOPE (Human-Centered Optimization for Supply Chain Excellence)

8 July 2024 - 1 February 2029
RESPOND (Resilience Enhancement Strategies for Pharmaceuticals Optimizing Differentiation)

RESPOND (Resilience Enhancement Strategies for Pharmaceuticals Optimizing Differentiation)

8 July 2024 - 31 August 2027
ELMO (Efficiency in Last-Mile Operations through physical standardization and improved consolidation strategies)

ELMO (Efficiency in Last-Mile Operations through physical standardization and improved consolidation strategies)

3 June 2024 - 1 May 2026
FLITS (Fresh Logistics with IoT in Sea-based supply chains)

FLITS (Fresh Logistics with IoT in Sea-based supply chains)

17 January 2024 - 31 January 2027
SPRINTER (Strategic Prescriptive Response for Immediate Needs Through Empowered Residents)

SPRINTER (Strategic Prescriptive Response for Immediate Needs Through Empowered Residents)

1 November 2023 - 31 October 2026
Cyber Security in the Rotterdam Maritime Sector

Cyber Security in the Rotterdam Maritime Sector

23 October 2023 - 31 October 2025
Modular Prefabricated Construction: a circular asset management system for closed-loop supply and logistics chains

Modular Prefabricated Construction: a circular asset management system for closed-loop supply and logistics chains

29 September 2023 - 31 December 2026
ECOLOGIC (Emission Control and Logistics Optimization for Green Infrastructure Construction)

ECOLOGIC (Emission Control and Logistics Optimization for Green Infrastructure Construction)

18 September 2023 - 31 August 2026
LOKET (LOgistieke KETenregie voor binnenstedelijk bouwen)

LOKET (LOgistieke KETenregie voor binnenstedelijk bouwen)

18 September 2023 - 28 February 2026
TRANSENERGY (Energietransitie op de bouwplaats – de route naar een zero-emissie bouwplaats)

TRANSENERGY (Energietransitie op de bouwplaats – de route naar een zero-emissie bouwplaats)

18 September 2023 - 28 February 2026
Transitioning towards resilient multimodal corridors using digital twinning

Transitioning towards resilient multimodal corridors using digital twinning

18 September 2023 - 31 December 2026
Next Gen Supply Chain Resilience: Short-Term Wins, Long-Term Gains

Next Gen Supply Chain Resilience: Short-Term Wins, Long-Term Gains

11 September 2023 - 1 September 2026
RESTRETCH (REverse STREss Testing in supply Chains)

RESTRETCH (REverse STREss Testing in supply Chains)

11 September 2023 - 30 September 2026

Stay up to date with the latest news